My Design Process From Kickoff to Handoff (With Real Timelines)
The five phases I use on every client project, and how long each one really takes.

Published Date:
Read Time:
5 min read
Category:
Process
Clients often ask, "So what happens after I say yes?" Here is the honest answer, with real timelines from a typical 5-week website project.
Phase 1: Discovery (3 days)
A kickoff call, a short questionnaire, and a review of existing brand assets. The goal is simple: understand the business goal, the audience, and what "success" means.
Output: a one-page project brief the client signs off on.
Phase 2: Direction (1 week)
I present a moodboard and two homepage concepts, not a full design. It's cheaper to change direction now than after 20 screens exist.
Output: one chosen direction, plus a style tile (colors, fonts, buttons).
Phase 3: Design (2 weeks)
Key pages first (home, services, contact), then the rest. I design desktop and mobile together so nothing is an afterthought.
Output: full page designs in Figma with a clickable prototype.
Phase 4: Feedback (1 week, max 2 rounds)
I limit revisions to two rounds and say so in the proposal. Feedback must come from one person, not a committee. This single rule saves more time than any tool.
Phase 5: Handoff (2-3 days)
Organized Figma file with named layers
Exported assets and a short usage guide
A 30-minute walkthrough call
The takeaway
Speed comes from clear phases and limited rounds, not from rushing the design itself.
[Next Journal]

